PKZ1081

Parkzone SV80 Long Lead 3 Wire Wing Servo

$26.99
In stock
up
down
 

Overview

This servo is used in the Spitfire Mk IX's aileron controls. It can also be used in the ParkZone Focke Wulf 190A. It is approximately 400mm in length.

Features

You're reviewing:

Parkzone SV80 Long Lead 3 Wire Wing Servo

Your Rating

Product Information

This servo is used in the Spitfire Mk IX's aileron controls. It can also be used in the ParkZone Focke Wulf 190A. It is approximately 400mm in length.

Specs

Length
24mm
Width
12mm
Height
26mm

Looking for spare parts or upgrades?

View all spare parts